The Ohrid Lake is currently receiving a continuous supply of water, which is being pumped into the system via the “Gavato” Hydro System located in Bogdanci. Authorities confirm that the replenishment effort is ongoing, with officials reporting that the volume of water pumped into the lake will increase in the coming days. According to the MIA, the current pumping rate stands at 200 liters per second, and additional supplies are anticipated shortly.
Technical assessments confirm that the water is being directed into a designated ground basin. Officials stated that no water loss has been detected during the process. Furthermore, the water source from Plavac was verified as adequate, negating the need for supplementary filling measures.
Maintenance work was recently completed on a valve necessary for the pumping operation, which required opening and cleaning to ensure proper flow. Regarding the capacity of the basin, an official noted that while the usual filling time is approximately 30 minutes, the process currently requires an estimated 20 hours to fill from a completely empty state. These efforts are crucial for maintaining the water levels in the lake.
The continuous pumping action ensures that the lake receives the necessary volume of water to stabilize its ecosystem.
Topics: #water #lake #pumped